Product Center

Professional floor paint manufacturers

Ramp channel

Product description: a two-component high solid anti-skid flat coating composed of epoxy resin, curing agent and anti-skid bead aggregate

Key Word:

Consultation:

Inquiry

Description

Product Description:Two-component high-solid anti-skid flat coating composed of epoxy resin, curing agent and anti-skid bead aggregate

Product use:Applicable to light industrial workshops, office buildings, warehouses, underground parking garages, food processing plants, etc.

Performance characteristics:1,With seamless dust, mildew and other excellent performance, anti-slip.

2. High hardness, excellent wear resistance, scratch resistance, toughness,

3, oil resistance, acid and alkali resistance, water resistance is good.

4, good leveling, non-slip beads evenly bedding, beautiful high-grade.

Construction method: Roll coating, it is recommended to scrape evenly with a flat knife first, then roll coating evenly with a roller, and roll coating construction by cross method

Dosage of recommend:The dosage of each course is 0.15 ㎏/㎡-0.2 ㎏/㎡. (Precautions: 1. If the dosage is less than 0.15KG/㎡, there will be serious orange peel and poor hiding power. Non-slip microbeads are poorly wrapped. 2. If the dosage is higher than 0.2KG/㎡, the curing will slow down and the hardness will rise slowly. 3, the color of poor hiding power needs to increase the dosage, do more to cover or use special technology, special color and technology please communicate with the technical department before deciding to place an order)

StorageDepositSex:Because material a contains a certain proportion of microbead anti-skid aggregate, it is currently observed that there will be no settlement during the normal storage period of 6 months. if stratified settlement occurs beyond the 6-month period, it can be stirred evenly and reused without affecting curing. the apparent effect can be applied if it meets the requirements.

Technical indicators:

Project

Reference Indicators

Test standard and description

Proportioning

A:B=100:23

 

Table dry (h)

1.5

25℃

Available time (min)

20

Practical work (d)

5 to 7

Time available (h)

24~36

Construction viscosity

180mpa.s

Adhesion (grade)

≤1

GB/T22374-2008

Pencil hardness

≥2H

GB/T22374-2008

Abrasion resistance (750g/500r,g)

≤ 0.030

GB/T22374-2008

Oil resistance (72h)

No blistering, no peeling, slight discoloration allowed

GB/T22374-2008

Alkali resistance (20% NaOH,72h)

Acid resistance (10% H2SO4,48h)

Water resistance

Qualified

GB/T22374-2008

 

Product use instructions

lThe construction shall be carried out under the conditions of ambient temperature ≥ 5 ℃ and relative humidity ≤ 85%, and the coating shall be applied on a clean, dry and pore-free intermediate coating. If the construction period is urgent, please test in a small area to confirm that there is no color difference problem before construction in a large area under high humidity conditions.

lThe product has been proved by experiments to have sufficient construction adaptability, should not add any solvent and diluent, if you want to add please consult our technical department.

lBefore construction, the component is fully mixed evenly, and the B component is mixed in proportion. Depending on the ambient temperature, the summer is fully stirred for 2 to 3 minutes, and the winter is fully stirred for 3 to 5 minutes, and the construction can be carried out;

lDuring construction, the material quantity per unit area shall be calculated according to the design thickness and material density;

lWhen the temperature is high, attention should be paid to the fast reaction gel and the use time can be shortened. Please determine the amount of ingredients for each time according to the actual temperature and construction progress. The prepared materials must be used up at one time, and the remaining A and B components must be sealed and preserved;

lEpoxy resin floor coating in the construction of the completion of the curing period of about 7 days (25 ℃), the first three days of the coating as the main curing period, clear completely closed workplaces, curing period to prohibit water and heavy pressure, so as not to artificially damage the epoxy coating;

lStorage conditions: should be sealed in a cool and dry place, storage temperature 10~35 ℃; less than 10 ℃ storage conditions, paint components may occur crystallization state, available water bath heating method heating 3-5 hours to remove the crystallization state, does not affect the curing effect, but the surface coating needs to use 120 mesh filter after use.

lDuring transportation, ensure that the carriage environment is dry and closed, and the material code is laid flat and stable.

lDuring construction, please keep the site well ventilated and no smoking. Please wear protective clothing, gas mask and protective gloves during construction to avoid inhalation of paint mist and skin contact with paint. Paint spilled on the skin should be cleaned immediately with a suitable detergent. If splashed into eyes, rinse immediately with plenty of water and seek medical attention immediately.

lThis product is flammable articles, storage, transportation, construction must be away from the fire source and maintain good ventilation; in case of fire, use dry powder fire extinguisher or sand cover to extinguish the fire;

 

Get A Quote

Note: Please leave your email address, our professionals will contact you as soon as possible!